Crane Capacity Upgradation

Service Details

EOT AND GANTRY Crane Capacity Upgradation can save over 50% of cost as compared to replacement of existing EOT AND GANTRY crane by new. However, EOT AND GANTRY Crane upgradation needs high degree of understanding of crane design and analytical ability to carry out accurate, reverse engineering.

We do undertake Upgradation of Complete electrical system of EOT AND GANTRY crane this may include replacement of slipring ind. Motor by Sq. Cage Ind.

  •  VVVF Drive Control Provision for all motion of motor of Compact Festoon Cable System/Drag Chain in Place of Open wire Festooning Systems for Trolley power Supply, Replacement of angle type DSL/ Open wire DSL by shrouded busbar, changing of electrical Cables and Installation of electronic load weighing systems, overload limiting on EOT AND GANTRY crane.
  • In most cases,customer manufacturing drawing of existing EOT Cranes are not available with crane user and in such situation detailed study of existing crane is essential to determine its suitability for capacity /span upgradation.
  • Study of EOT Crane operation to determine duty cycle, visual Observation, dimensional verification, ND Testing of Plates to determine residual thickness of load bearing structures, Measurement of speed of Hoist, CT & LT Motion, Measurement of Motor Current, Measurement of Crane Girder Deflection under load and analysis of structure.

Enquiry

    I accept the privacy and terms.